Welcome: Guangzhou Permanent Marina Co.,ltd
Language: Chinese ∷  English

News Center

Guangdong Fishery Administration Duty Wharf

Project location: Guangdong



Area: 68 ㎡



Purpose: To facilitate the staff on duty to perform tasks more conveniently and quickly. Improve efficiency.



Parameter requirements:



1. Aluminum structure wharf (new type aluminum alloy, marine grade 6061 aluminum alloy, T6 heat treatment, MIG welding, and scientific surface treatment)




2. Floating tank (HDPE for short)





3. Plastic-wood panel (anti-slip plastic board 145 * 24)





4. Rubber fender (to reduce the impact force caused by inertia when the ship is moored on water, with high strength impact rebound)





5. Mooring post (304 stainless steel 250 * 65 * 100mm mooring force: 2.5-5t)





6. Pile holding device (each set with 4 nylon rollers)



Site detail drawing:

CATEGORIES

LATEST NEWS

CONTACT US

Contact: 0086-139 0240 2448 Tim Hui

Phone: 13660108188 15920552310

Tel: 020-82396205

Email: gzhengqiao@163.com

Add: Room 658, 6th floor, Yufeng Business Center, 2 Jinghu Avenue, Huadu District, Guangzhou City

Scan the qr codeClose
the qr code